GENERAL
DESCRIPTION
OF THE PROJECT |
: |
Th port buildings includes a total of ten
number of reinforced concrete and steel
buildings for the operation of port, as
well as, fire water, potable water, heavy
fuel-oil, power distribution, drainage and
sewage systems. The total covered area of
the buildings were 6397 m2. |