Government / Municipality

Defense
Infrastructures
Urban Development
Standards and Regulations
Communication
Telecommunication Networks
Transportation
Airport
Bridges
Ports and Harbors
Rail and Transit
Road and Highways
Tunnels
Power
Power Plants
Power Transmission and distribution Systems
Oil & Gas
Buildings

 

 
 
PROJECT :
ISLAMABAD - TURKISH EMBASSY BUILDINGS CONSTRUCTION, PAKISTAN
     
CLIENT :
The Ambassador of the Republic of Turkey Turkish Embassy- Islamabad
CONSTRUCTION VALUE : 4.753.599 USD
GENERAL DESCRIPTION
OF THE PROJECT

:
Construction of Turkish Embassy Buildings
(Chancery and Residence)
The cutting off the trees as directed by Engineer, boring a well for water, all kind of excavation, for foundation level all kind of concrete and structural concrete, all kind of reinforcement steel, damp/water proofing at foundation as per local conditions if necessary, drainage at basement, backfilling, and for grade level and super structure as per schedules and drawings, all kind of civil, mechanic and electrical works, excavation, backfilling, blinding, finishes for walkway around building, excavation, graded backfilling for the parking areas, walkways, secondary roads, connection to main road as shown in drawings, necessary excavation, backfilling for garden, retaining walls, sloops, garden stairs, hardscaping, landscaping, irrigation system as shown in drawings, preparing green areas, keeping some existing trees and concrete water tank. Ventilating equipment, all necessary civil and electrical works for lighting poles and accessories, central heating and pumping system, canals from central units to the buildings, ventilating system, connection to local facilities, all kind of insulation works as per local regulations, and producing fixed furniture at rooms which are chosen by Engineer. Costs of all productions to complete these works, in case of preparig detail drawings by Contractor, all loading and unloading, storing, transportation in and/or out the site, custom taxes, all kind of official fees by local authorities, contractors profit and overheads are included in that lump sum price.