GENERAL
DESCRIPTION
OF THE PROJECT |
: |
The Project covers the construction of trench
excavation, laying of bedding material under
pipes & placing the pipes on aggregate
filled bags, Removing of sheet pile by underwater
cutting equipment, Installation of 59 pieces
of steel pipes and 12*2 pieces of manholes
along three lines, Installation of three
intake heads weighing 96 ton each, The capacity
of the water intake structure is 4 m3/sec,
Installation of chlorination GRP pipes 200
mm in diameter & 1620 m in length laying
along three lines parallel to the steel
pipes. |