GENERAL
DESCRIPTION
OF THE PROJECT |
: |
The Contract involves the construction of
a 6000 m3/hr capacity pumping station, a
twin water transmission main 9920 m. long
with = 1000 mm. water and also another 16951
m. long = 1000 mm. single water transmission
main, mixing facilities, a bulk storage
tank, all the affiliated works for connecting
the water supply scheme with the existing
reservoirs, including all electromechanical
equipment and installations. |