GENERAL
DESCRIPTION
OF THE PROJECT |
: |
The project location is 400 m to the sea
in Sirte and the project involves the construction
of A/C and GRP Pipe Main Collectors. D/I
pipe rising mains, 5 nos Pumping Station
and Sewage Treatment Plant including electro-mechanical
installations. 2 years maintenance, operating
and training. The total length of pipeline
is 25 km. |