63 KM, 36'' BOZÜYÜK-ADAPAZARI
NATURAL GAS PIPELINE, PHASE 1, TURKEY (Location:
Geyve - Bozöyük)
CLIENT
:
BOTAS (Turkish Petroleum Pipeline Corporation)
CONSTRUCTION
VALUE
:
12.996.000
USD
GENERAL
DESCRIPTION
OF THE PROJECT
:
Survey, construction and commissioning of
63 km, 36" x 11.1 mm spiral welded
steel pipeline. The line pipes shall be
externally extruded polyethylene coated.