GENERAL
DESCRIPTION
OF THE PROJECT |
: |
The project scope of work include installation
of 2 No's of Submarine Steel Pipelines 1400
mm. diameter, dredging a underwater trench
gravel filling, underwater concreting, laying
GRP chlorination pipes and cathodic protection
cables.The total length of pipelines is
600 m. It is included also 2 Nos. of concrete
intake head installation weighing 360 tons
each. |