GENERAL
DESCRIPTION
OF THE PROJECT |
: |
The project covers the construction of dredging
of the 413 meter and 1.273 meter intake
and discharge channels of the pipe line
both on onshore and offshore, laying and
leveling of the bedding material under the
pipe lines, installation of Ø2800 mm and
Ø2400 mm GRP pipes, manholes, diffusers,
vent domes, filling of the trenches with
qualified and excavated materials. |