Government / Municipality

Defense
Infrastructures
Urban Development
Standards and Regulations
Communication
Telecommunication Networks
Transportation
Airport
Bridges
Ports and Harbors
Rail and Transit
Road and Highways
Tunnels
Power
Power Plants
Power Transmission and distribution Systems
Oil & Gas
Buildings

 

 
 
PROJECT :
SUPPLY OF EQUIPMENT AND ARE PRODUCTION AT ASIKÖY AND BAKIBABA UNDERGROUND MINE IN KASTAMONU-TURKEY
     
CLIENT :
General Directorate of Etibakir Copper Mine Process Administration
CONSTRUCTION VALUE : 28.697.760 USD
GENERAL DESCRIPTION
OF THE PROJECT

:
Totally 3 024 000 copper ore production at Asiköy and Bakibaba underground mines in ten years. The scope covers 300000 ton/year %2 copper ore production between 930-792 levels in Asiköy underground mine, 36000 ton/year %3,5 copper ore production between 926-815 levels in Bakibaba underground mine, totaly 2700000 copper ore production from Asiköy and 324000 copper ore production from Bakibaba ore production works. For above mentioned production; band conveyor, feeder, crane, railed locomotive systems, breaker, ventilation, water drainage equipment, ramble equipment, electric, electronic, local communication signaling, ramble and all required machine and equipment installation or assembly.