GENERAL
DESCRIPTION
OF THE PROJECT |
: |
Totally 3 024 000 copper ore production
at Asiköy and Bakibaba underground mines
in ten years. The scope covers 300000 ton/year
%2 copper ore production between 930-792
levels in Asiköy underground mine, 36000
ton/year %3,5 copper ore production between
926-815 levels in Bakibaba underground mine,
totaly 2700000 copper ore production from
Asiköy and 324000 copper ore production
from Bakibaba ore production works. For
above mentioned production; band conveyor,
feeder, crane, railed locomotive systems,
breaker, ventilation, water drainage equipment,
ramble equipment, electric, electronic,
local communication signaling, ramble and
all required machine and equipment installation
or assembly. |