GENERAL
DESCRIPTION
OF THE PROJECT |
: |
Construction of 5263 m long 2*2 motorway
between Ümraniye-Altunizade connecting the
first and the second ring roads, 9217 m
long 1*2 side roads, miscellaneous ancillary
roads and junction roads.The works also
include 2034 m long tunnels, jet-grouting,
shotcreting and construction of 3 viaducts,
each 404 m long. |