Design and installation of local telephone
networks as 28 groups at Adana (South
Anatolia-Mediterranean Region) and its
counties have been completed and delivered
in working conditions. The main characteristics
of the work are indicated below.
-Duct construction (bore-meter): 1,045,543,
- Manhole construction (unit): 2,863
-Underground cable installed in various
capacities (km): 300
-Wooden poles installed (unit) : 17,818,
-Cable conductor splicing (pair): 928,904
- Overhead cable installed in various
capacities (km) : 733