Design and installations of local telephone
networks as 28 groups at Izmir and its
counties have been completed and delivered
in working conditions. The main characteristics
of the work are indicated below.
-Duct construction (bore-meter): 615,898,
-Manhole construction (unit): 1,219
-Underground cable installed in various
capacities (km): 394
-Wooden poles installed (unit) : 9,304,
-Cable conductor splicing (pair): 2,261,519
-Overhead cable installed in various capacities
(km): 304