The project comprises 88 km "armoured
cable" and 72 km "cable"
laying works in the route of Çorlu-Tekirdag-Kesan-Ipsala.
In Kesan section of the route, fibre
optic cable with 10 elements (140 M bit/s)
and in the rest of the route fibre optic
cable with 6 elements (34 M bit/s) will
be laid.