The scope of the project is the Railway
Electrification between Iskenderun-Divrigi.
This electrification shall be fulfilled
as follows :
577 km-track catenary which is equivalent
to 724 km route, 13 substations for catenary
energy supply, 12 section posts, 55 switching
posts in railway stations, 3 remote control
equipments which shall be controlled by
3 centers for the posts and substations
in their operation regions, telecommunication
equipment for electrification purposes.
The existing tunnels on the route shall
be studied, moded and modifications in
respect of gauge shall be determined and
performed. All necessary engineering services,
workmanship and the supply of material
shall be realised on turn-key basis for
above mentioned obligations and works.